Project Description

Client:  McCloy Group
Location:  Teralba (Lake Macquarie), NSW
Date: 2011 – 2018

The Billy’s Lookout development is uniquely located at high elevations at the northern end of Lake Macquarie. The site area is approximately 70 hectares with an ultimate development yield of 485 residential lots.

GCA's Involvement

  • Preparation of a revised stormwater management strategy including flow and water quality modelling
  • Water and sewer servicing strategies including water network pressure modelling, for Hunter Water approval
  • Civil engineering design of roads, stormwater drainage, and ancillary infrastructure
  • Split level (“grade separated”) entry road design to better reflect natural slope on the land whilst also creating the opportunity for entry landscaping features
  • Major stormwater culvert crossing design
  • Stormwater quality treatment and detention basin design
  • Water supply and gravity sewerage design (Hunter Water Major Works)
  • Water and sewerage rail line crossing design